Example audit · Studio M · 6 peoplePart 1 of 7
Workflow map
Supplier quote, from client request to approved order.
- Client asks for optionsEmail or WhatsApp · Studio manager15 min
- Request quotes from 3 suppliersCopy-paste specs into 3 emails40 min
- Chase repliesAverage 2.4 follow-ups per supplier55 min
- Build comparison sheetRetyped by hand into Excel50 min
- Client approvalSent as PDF, approval lost in email20 min
Bottleneck: steps 3–4 take 58% of the time.
Time baseline
Admin hours per week, measured over 2 weeks.
Studio manager11 h
Principal6 h
Project architect4 h
Junior designer2 h
Total admin23 h / wk
Billable value lost (example)$5,500 / mo
Ranked fixes
| # | Fix | Hours / wk | Est. build |
| 1 | Supplier quote intake and comparison | 6.5 h | 2 weeks |
| 2 | Monthly close for the accountant | 5.5 h | 2 weeks |
| 3 | Client follow-up and approvals log | 4.0 h | 1 week |
| 4 | Leave alone: drawings and design reviews | — | — |
Tools & data
What you already use, and how ready it is to connect.
Leave alone
Not everything should be automated. These stay with your team.
- Design reviewsJudgment calls. Automation would slow them down, not speed them up.
- Drawings and BIMOutside our scope, and your software already handles them.
- First client meetingThe relationship is the product. Keep it personal.
90-day roadmap
Built in order, biggest time savings first.
Days 1–30Supplier quotesIntake, comparison, one-click approval
Days 31–60Monthly closeExpenses tagged per project for the accountant
Days 61–90Follow-ups & approvalsAutomatic reminders, approvals log
Target in this sample: ~16 h / wk back by day 90, re-measured at each phase.
Walkthrough call
60 minutes, with whoever runs the studio day to day.
- 10 minWhat we foundThe map and the baseline, in plain language.
- 20 minThe ranked fixesCost, hours saved and order for each.
- 20 minYour questionsIncluding what to do yourselves, without us.
- 10 minNext stepsBuild with us, build alone, or wait. All fine.